13 Years Factory wholesale 22641-T Swaged Hose Fiting for Saudi Arabia Manufacturer
13 Years Factory wholesale 22641-T Swaged Hose Fiting for Saudi Arabia Manufacturer Detail:
45° BSP O’RING FEMALE 60° CONE
PART NUMBER |
HOSE
|
THREAD T |
B mm |
L mm |
A mm |
M mm |
H2 mm |
||
|
DN |
In |
SIZE |
|
|
|
|
|
|
S226C1 – 04 – 04OR | 6 | 1/4″ | 04 | 1/4″ – 19 | 4 | 35,2 | 5,2 | 14,7 | 19 |
S226C1 – 06 – 06OR | 10 | 3/8″ | 06 | 3/8″ – 19 | 7 | 40,9 | 6 | 17,3 | 22 |
S226C1 – 08 – 08OR | 12 | 1/2″ | 08 | 1/2″ – 14 | 9,3 | 47,6 | 6,5 | 19,9 | 27 |
S226C2 – 10 – 10OR | 16 | 5/8″ | 10 | 5/8″ – 14 | 12 | 56,8 | 9,7 | 25,8 | 30 |
S226C2 – 12 – 12OR | 20 | 3/4″ | 12 | 3/4″ – 14 | 15 | 67,8 | 9 | 30,3 | 32 |
S226C2 – 16 – 16OR | 25 | 1″ | 16 | 1″ – 11 | 19,5 | 84,4 | 10,5 | 37,4 | 38 |
S226C2 – 16 – 20OR | 25 | 1″ | 16 | 1.1/4″ – 11 | 26 | 90,1 | 10,1 | 41,6 | 50 |
S226C2 – 20 – 20OR | 32 | 1.1/4″ | 20 | 1.1/4″ – 11 | 26 | 100,7 | 10,1 | 44,8 | 50 |
S226C2 – 20 – 24OR | 32 | 1.1/4″ | 20 | 1.1/2″ – 11 | 32 | 101,3 | 12,5 | 45,5 | 55 |
S226C2 – 24 – 24OR | 40 | 1.1/2″ | 24 | 1.1/2″ – 11 | 32 | 112,5 | 12,5 | 49 | 55 |
S226C2 – 24 – 32OR | 40 | 1.1/2″ | 24 | 2″ – 11 | 42 | 116 | 16,1 | 52,5 | 70 |
S226C2 – 32 – 32OR | 50 | 2″ | 32 | 2″ – 11 | 42 | 132,9 | 16,1 | 55,7 | 70 |
Product detail pictures:
Related Product Guide:
How to Replace a Hydraulic Hose Fitting
Tube Fittings and Pipe Fittings – Double Ferrule Tube Fittings
We now have several exceptional workers customers good at marketing, QC, and working with types of troublesome trouble during the creation system for 13 Years Factory wholesale 22641-T Swaged Hose Fiting for Saudi Arabia Manufacturer, The product will supply to all over the world, such as: Indonesia, Jordan, Palestine, We pay high attention to customer service, and cherish every customer. We've maintained a strong reputation in the industry for many years. We are honest and work on building a long-term relationship with our customers.
On my new farm, I’ll be building all the fences to be train-proof (ironically enough there are rails nearby). In this first part of the video, I try to explain how I am building the entire fence in pieces, and fully welding every joint. This project will be very labor intensive, time consuming, and costly, but I hope that I will never have to ever build this fence again!
I acknowledge now that I have way over complicated things in this video. Perhaps the better name would be “how to make a 4 way cross” on pipe fence. I know now how to properly make a coping cut and saddle joint. Thank you all for your interest, I appreciate supportive comments and tips.
This pipe is 2 3/8″ OD tubing (J-55), with a ~1/4″ thick wall, weighing in at 4.7 lbs/foot!
By Martina from Jeddah - 2017.12.31 14:53
It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.
By Audrey from Ghana - 2018.08.12 12:27