One of Hottest for CD-W Metric Thread Bite Type Tube Fitting to Suriname Importers

Short Description:

RUN TEE FITTINGS WITH SWIVEL NUT   PART NOMBER MPa TUBE O D. d1 L1 l1 l2 S2 S3 O型圈 bar CC-06L L 06 M12x1.5 27 12.0 26.0 14 12 OR4.5×1.5 315 CC-08L   08 M14x1.55 29 14.0 27.5 17 12 OR6.5×1.5 315 CC-10L   10 M16x1.55 30 15.0 29.0 19 14 OR8x1.5 315 CC-12L   12 M18x1.5 32 17.0 29.5 22 17 OR10x1.5 315 CC-15L   15 M22x1.5 36 21.0 32.5 27 19 OR12x2 315 CC-18L   18 M26x1.5 40 23.5 35.5 32 24 OR15x2 315 CC-22L   22 M 30×2 44 27.5 38.5 3...


Product Detail

Product Tags

Related Video

Feedback (2)

We are ready to share our knowledge of marketing worldwide and recommend you suitable products at most aggressive costs. So Profi Tools offer you finest benefit of money and we are ready to produce alongside one another with Hose Fittings Parker Catalog, Universal Vacuum Hose Adapter, Swage Fitting, We sincerely hope to serve you and your business with a good start. If there is anything we can do for You, we shall be more than pleased to do so. Welcome to our factory for visit.
One of Hottest for CD-W Metric Thread Bite Type Tube Fitting to Suriname Importers Detail:

RUN TEE FITTINGS WITH SWIVEL NUT

37

 

PART NOMBER

MPa

TUBE O D.

d1

L1

l1

l2

S2

S3

O型圈

bar

CC-06L L 06 M12x1.5 27 12.0 26.0 14 12 OR4.5×1.5 315
CC-08L   08 M14x1.55 29 14.0 27.5 17 12 OR6.5×1.5 315
CC-10L   10 M16x1.55 30 15.0 29.0 19 14 OR8x1.5 315
CC-12L   12 M18x1.5 32 17.0 29.5 22 17 OR10x1.5 315
CC-15L   15 M22x1.5 36 21.0 32.5 27 19 OR12x2 315
CC-18L   18 M26x1.5 40 23.5 35.5 32 24 OR15x2 315
CC-22L   22 M 30×2 44 27.5 38.5 36 27 OR20x2 160
CC-28L   28 M 36×2 47 30.5 41.5 41 36 OR26x2 160
CC-35L   35 M 45×2 56 34.5 51.0 50 41 OR32x2.5 160
CC-42L   42 M 52×2 63 40.0 56.0 60 50 OR38x2.5 160
CC-06S S 06 M14x1.5 31 16.0 27.0 17 12 OR4.5×1.5 630
CC-08S   08 M16x1.5 32 17.0 27.5 19 14 OR6.5×1.5 630
CC-10S   10 M18x1.5 34 17.5 30.0 22 17 OR8x1.5 630
CC-12S   12 M20x1.5 38 21.5 31.0 24 17 OR10x1.5 630
CC-14S   14 M22x1.5 40 22.0 35.0 27 19 OR11x2 630
CC-16S   16 M24x1.5 43 24.5 36.5 30 24 OR13x2 400
CC-20S   20 M 30×2 48 26.5 44.5 36 27 OR16.3×2.4 400
CC-25S   25 M 36×2 54 30.0 50.0 46 36 OR20.3×2.4 400
CC-30S   30 M 42×2 62 35.5 55.0 50 41 OR25.3×2.4 400
CC-38S   38 M 52×2 72 41.0 63.0 60 50 OR33.3×2.4 315

Product detail pictures:

One of Hottest for CD-W Metric Thread Bite Type Tube Fitting to Suriname Importers detail pictures


Related Product Guide:
Importance of PVC Fittings
Understanding Hydraulic Hose Fittings

Sticking for the perception of Creating products of top quality and producing friends with people today from all around the world, we constantly place the desire of shoppers to start with for One of Hottest for CD-W Metric Thread Bite Type Tube Fitting to Suriname Importers, The product will supply to all over the world, such as: Maldives, Sri Lanka, Benin, Hard work to keep making progress, innovation in the industry, make every effort to first-class enterprise. We try our best to build the scientific management model, to learn abundant experienced knowledge, to develop advanced production equipment and production process , to create the first-call quality goods, reasonable price , high quality of service , quick delivery , to present you create new value .


  • Watch the full episode: https://www.thisoldhouse.com/watch/ask-toh-nasa-simulated-panels

    Ask This Old House plumbing and heating expert Richard Trethewey helps a homeowner install an indirect water heater onto an existing steam boiler to boost the amount of hot water in the house.

    Click here to SUBSCRIBE to the official This Old House YouTube channel: https://www.youtube.com/subscription_center?add_user=thisoldhouse

    Time:
    5-6 hours

    Cost:
    $3000

    Skill Level:
    Difficult

    Tools List:
    Hose
    Water pump
    Level
    Propane torch
    Pipe cutter
    Adjustable wrench
    Pipe wrench pliers

    Shopping List:
    1” copper pipe
    ½” copper pipe
    Y-Strainer
    Ball valves
    Shut off valves
    Circulator Pump
    Thermostatic mixing valve
    Relief valve
    Water temperature sensor
    Sensor relay
    Solder
    Shims
    Sand cloth
    Pipe dope

    Steps:
    1. Turn off the main power switch on the boiler and the main water supply to the boiler.
    2. Hook up a hose and water pump to the boiler’s draw off valve to drain down the water in the boiler. If possible, pump the water into a utility sink or extend the hose outdoors.
    3. Find a spot for the new water heater. Use shims and a level to make sure it is sturdy and level.
    4. Find a workable place to tap into the boiler to connect the boiler to the indirect water heater via the heat exchanger coil- preferably just below the water line to avoid any potential for sludge near the bottom of the boiler.
    5. Dry fit 1” copper pipe connections from boiler to the heat exchanger coil input. Be sure to place a ball valve shut off at the tap point. Place a Y-Strainer after the ball valve to act as a filter and flush point. Use appropriate adapter pipe fittings, pipe dope and plumber’s tape to connect piping. Make sure all connections are level.
    6. Before soldering any copper pipes, be sure to use sand cloth and flux on all the connections.
    7. Solder the connections with solder and a propane torch.
    8. Break the connection to the boiler draw off valve. This input will now serve as the return for the heat exchanger coil and a draw off.
    9. Dry fit 1” copper pipe connections from the heat exchanger coil output to the input of the boiler. The pipe run should include a circulator pump, a purge valve, shut off ball valve and a second purge valve in that order.
    10. Solder the connections with solder and a propane torch.
    11. Break the connection to the main water supply into the boiler using a pipe cutter. Be sure to have a bucket ready to catch any excess water.
    12. Dry fit ½” copper pipe connections from the main water supply to the cold water input at the bottom of the indirect water heater. Use appropriate adapter pipe fittings, pipe dope and plumber’s tape to connect piping. The pipe run should include a tee coupling to reconnect the new run to the boiler. Include a shut off valve after the coupling into the boiler. Extend piping off the middle portion of the tee coupling. Pipe should extend to the indirect water heater and include a draw off valve at the cold input. Additional pipe should also be connected to the thermostatic mixing valve.
    13. Break the connection from the boiler to the main hot water feed into the home using a pipe cutter.
    14. Dry fit the ½” copper pipe connections from the output on top of the indirect water heater. The pipe run should feed to a relief valve, the thermostatic mixing valve and connect to the main hot water feed into the home.
    15. Solder the connections with solder and a propane torch.
    16. Attach a temperature sensor to the indirect water heater.
    17. Attach an electronic relay to the boiler.
    18. Make the electrical connections from the temperature sensor to the relay on the boiler and the circulator pump.
    19. Turn the main power switch on the boiler back on.
    20. Turn the water supply valve back on.
    21. Use the purge valves to eliminate any excess air in the system. You’ll need a bucket to catch the water.
    22. It will take some time for the water heater tank to fill and heat up.

    Follow This Old House and Ask This Old House:
    Facebook: https://www.facebook.com/ThisOldHouse
    Twitter: https://twitter.com/thisoldhouse

    https://twitter.com/asktoh

    Pinterest: https://www.pinterest.com/thisoldhouse/
    G+: https://plus.google.com/+thisoldhouse/posts
    Instagram: https://instagram.com/thisoldhouse
    Tumblr: https://thisoldhouse.tumblr.com/



    Super Alloy 1 350 degree solder is used to fill a large gap in 2 pieces of galvanized steel. Galvanized steel is salt-water resistant, and is frequently used in marine and industrial applications. Super Alloy 1 is also used heavily in the Roofing and Gutter industry. Works on flashing, hip cap, ridge cap, drains, panels, and more. Super Alloy 1 works at half the melting point of the galvanized or zinc coating so it greatly reduces the chance of burning or ruining the coating.

    Please read all instructions prior to use at: https://www.muggyweld.com/wp-content/uploads/2017/04/Super-Alloy-1-instructions.pdf

    For more videos and information, or to order, visit https://MuggyWeld.com

    International customers, please order at: https://www.ebay.com/usr/muggyweld
    _________________
    Please visit https://www.aws.org/technical/facts/ prior to using Muggy Weld products, and adhere to all AWS welding safety guidelines. Further product safety information is available at https://muggyweld.com/safety-guidelines.

    Muggy Weld LLC shall not be liable for any loss, injury, claim, liability, or damage of any kind resulting in any way from (a) your use of this Site, (b) any services or products obtained from this Site, (c) any errors in or omissions from this Site, (d) the unavailability or interruption of this Site or any features thereof, (e) any content contained on this Site.

    MSDS sheets available with purchase from MuggyWeld.com, upon request.

    We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By Priscilla from Vancouver - 2018.12.14 15:26
    The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Ricardo from Paraguay - 2018.11.02 11:11

    Related Products

    WhatsApp Online Chat !