Hot sale good quality Ferrule for 4SP for Vietnam Manufacturer

Short Description:

FERRULE FOR 4SP, 4SH10-16,R12 06-16   PART NUMBER HOSE D mm L mm   DN In SIZE     S00400 – 04 6 1/4″ 04 22 30 S00400 – 06 10 3/8″ 06 26 32.5 S00400 – 08 12 1/2″ 08 30 34.5 S00400 – 10 16 5/8″ 10 34 40 S00400 – 12 20 3/4″ 12 38 45.5 S00400 – 16 25 1″ 16 46 60 S00400 – 20 32 1.1/4″ 20 56 66 S00400 – 24 40 1.1/2″ 24 65 75 S00400 – 32 50 2″ ...


Product Detail

Product Tags

Related Video

Feedback (2)

Sincerity, Innovation, Rigorousness, and Efficiency would be the persistent conception of our corporation to the long-term to establish collectively with customers for mutual reciprocity and mutual benefit for Walker Split Flange Repair Kit, Pressure Washer Hose Fitting Size, Split Flanges To Irish, Our company eagerly looks forward to establishing long-term and friendly business partner relationships with clients and businessmen from all over the world.
Hot sale good quality Ferrule for 4SP for Vietnam Manufacturer Detail:

FERRULE FOR 4SP, 4SH10-16,R12 06-16

31

 

PART NUMBER

HOSE

D

mm

L

mm

 

DN

In

SIZE

 

 

S00400 – 04 6 1/4″ 04 22 30
S00400 – 06 10 3/8″ 06 26 32.5
S00400 – 08 12 1/2″ 08 30 34.5
S00400 – 10 16 5/8″ 10 34 40
S00400 – 12 20 3/4″ 12 38 45.5
S00400 – 16 25 1″ 16 46 60
S00400 – 20 32 1.1/4″ 20 56 66
S00400 – 24 40 1.1/2″ 24 65 75
S00400 – 32 50 2″ 32 79 79

Product detail pictures:

Hot sale good quality Ferrule for 4SP for Vietnam Manufacturer detail pictures


Related Product Guide:
Things to Know About Pipe Fitting Works
Tube Fittings and Pipe Fittings – Double Ferrule Tube Fittings

We emphasize development and introduce new products into the market every year for Hot sale good quality Ferrule for 4SP for Vietnam Manufacturer, The product will supply to all over the world, such as: Riyadh, belarus, Hanover, We believe that good business relationships will lead to mutual benefits and improvement for both parties. We now have established long-term and successful cooperative relationships with many customers through their confidence in our customized services and integrity in doing business. We also enjoy a high reputation through our good performance. Better performance will be expected as our principle of integrity. Devotion and Steadiness will remain as ever.


  • https://www.plumberx.com
    In this video we start by removing the old two handle tub and shower valve from inside the wall. First we remove the handles and spout leaving the shower head in place to hold up the old shower valve and keeping it there until the new shower valve is in place this makes it easy and keeps use inline with the new installation and makes it very easy to line up the new shower head. Now that we have the handle off its time to go around on the back side and cut into the wall or if were lucky there just may be a trap door on the back side that gives us access to the tub and shower valve from the back side. Once on the back side of the tub and shower valve we start by disconnecting the unions on the old two handle tub and shower valve. Now the part that goes up to the shower head is copper. What we are going to do here is take our torch and heat the solder connection and pull the valve loose from the shower head riser pipe. Now with the old tub and shower valve out the way lets go back to the front side in the bath room. Now this was a three handle tub and shower valve so were going to have to make some adjustments to the hole in the wall in this case we will have to open the middle hole a little wider for the new single handle tub and shower valve. This is not your standard drywall (sheetrock) wall this is old and very thick no cutting this with a saw saw. What were going to do here is use a hammer and just lightly knock out pieces of the wall slow and easy. Don’t worry about covering up the old holes they make a cover plate for that. We have the hole just how we won’t it lets go back to the other side behind the tub and shower. What I like to do is put my new tub and shower valve to gather and solder pieces in place before I start working in the wall with it and I also remove the washers in the valve so we don’t damage the washers with the hot torch and burn them up once all this is done I take the tub and shower valve and put it into place line it up and make all the necessary connections from the back side from here I go back to the front of the valve in that bath room and start putting all the trim on but installing the cover plate first then if you like caulk it. Thank you for watching coolplumbingvideos.

    The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
    5 Stars By Mark from France - 2018.12.22 12:52
    As an international trading company, we have numerous partners, but about your company, I just want to say, you are really good, wide range, good quality, reasonable prices, warm and thoughtful service, advanced technology and equipment and workers have professional training, feedback and product update is timely, in short, this is a very pleasant cooperation, and we look forward to the next cooperation!
    5 Stars By Elsie from Cancun - 2017.09.29 11:19

    Related Products

    WhatsApp Online Chat !