Discount wholesale Interlock Hose Fitting to Chile Factories

Short Description:

90° SAE FLANGE 3000 P.S.I. PART NUMBER HOSE   FLANGE B mm L mm D mm  M mm  S mm   DN In SIZE             H873B0 - 10 - 12 16 5/8″ 10 3/4″ 18 50,9 38,1 52,8 6,73 H873B0 - 12 - 12 20 3/4″ 12 3/4″ 18 60,1 38,1 58,4 6,73 H873B0 - 12 - 16 20 3/4″ 12 1″ 24 60,1 44,5 59,5 8 H873B0 - 16 - 16 25 1″ 16 1″ 24 74,2 44,5 70,5 8 H873B0 - 16 - 20 25 1″ 16 1.1/4″ 30 74,2 50,8 72 8 H873B0 - 20 ...


Product Detail

Product Tags

Related Video

Feedback (2)

While in the past few years, our organization absorbed and digested innovative technologies both equally at home and abroad. Meanwhile, our organization staffs a group of experts devoted for the advancement of Split Flange Dimensions, Hose Fittings Caboolture, Hose Adapter Fittings, With a wide range, good quality, reasonable prices and stylish designs,Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs.
Discount wholesale Interlock Hose Fitting to Chile Factories Detail:

90° SAE FLANGE 3000 P.S.I.

PART NUMBER HOSE  

FLANGE

B

mm

L

mm

D

mm

 M

mm

 S

mm

  DN In SIZE            
H873B0 - 10 - 12 16 5/8″ 10 3/4″ 18 50,9 38,1 52,8 6,73
H873B0 - 12 - 12 20 3/4″ 12 3/4″ 18 60,1 38,1 58,4 6,73
H873B0 - 12 - 16 20 3/4″ 12 1″ 24 60,1 44,5 59,5 8
H873B0 - 16 - 16 25 1″ 16 1″ 24 74,2 44,5 70,5 8
H873B0 - 16 - 20 25 1″ 16 1.1/4″ 30 74,2 50,8 72 8
H873B0 - 20 - 20 32 1.1/4″ 20 1.1/4″ 30 90,2 50,8 79,5 8
H873B0 - 20 - 24 32 1.1/4″ 20 1.1/2″ 36 90,2 60,3 83 8
H873B0 - 24 - 24 40 1.1/2″ 24 1.1/2″ 36 100,6 60,3 95 8
H873B0 - 24 - 32 40 1.1/2″ 24 2″ 48 100,6 71,4 97 9,53
H873B0 - 32 - 32 50 2″ 32 2″ 48 127 71,4 113,5 9,53

Product detail pictures:

Discount wholesale Interlock Hose Fitting to Chile Factories detail pictures


Related Product Guide:
Tube Fittings and Pipe Fittings – Double Ferrule Tube Fittings
Things to Know About Pipe Fitting Works

Our items are commonly identified and trusted by people and can fulfill repeatedly altering economic and social wants of Discount wholesale Interlock Hose Fitting to Chile Factories, The product will supply to all over the world, such as: Curacao, Rotterdam, Lebanon, In the new century, we promote our enterprise spirit United, diligent, high efficiency, innovation, and stick to our policybasing on quality, be enterprising, striking for first class brand. We would take this golden opportunity to create bright future.


  • Watch the full episode: https://www.thisoldhouse.com/watch/ask-toh-nasa-simulated-panels

    Ask This Old House plumbing and heating expert Richard Trethewey helps a homeowner install an indirect water heater onto an existing steam boiler to boost the amount of hot water in the house.

    Click here to SUBSCRIBE to the official This Old House YouTube channel: https://www.youtube.com/subscription_center?add_user=thisoldhouse

    Time:
    5-6 hours

    Cost:
    $3000

    Skill Level:
    Difficult

    Tools List:
    Hose
    Water pump
    Level
    Propane torch
    Pipe cutter
    Adjustable wrench
    Pipe wrench pliers

    Shopping List:
    1” copper pipe
    ½” copper pipe
    Y-Strainer
    Ball valves
    Shut off valves
    Circulator Pump
    Thermostatic mixing valve
    Relief valve
    Water temperature sensor
    Sensor relay
    Solder
    Shims
    Sand cloth
    Pipe dope

    Steps:
    1. Turn off the main power switch on the boiler and the main water supply to the boiler.
    2. Hook up a hose and water pump to the boiler’s draw off valve to drain down the water in the boiler. If possible, pump the water into a utility sink or extend the hose outdoors.
    3. Find a spot for the new water heater. Use shims and a level to make sure it is sturdy and level.
    4. Find a workable place to tap into the boiler to connect the boiler to the indirect water heater via the heat exchanger coil- preferably just below the water line to avoid any potential for sludge near the bottom of the boiler.
    5. Dry fit 1” copper pipe connections from boiler to the heat exchanger coil input. Be sure to place a ball valve shut off at the tap point. Place a Y-Strainer after the ball valve to act as a filter and flush point. Use appropriate adapter pipe fittings, pipe dope and plumber’s tape to connect piping. Make sure all connections are level.
    6. Before soldering any copper pipes, be sure to use sand cloth and flux on all the connections.
    7. Solder the connections with solder and a propane torch.
    8. Break the connection to the boiler draw off valve. This input will now serve as the return for the heat exchanger coil and a draw off.
    9. Dry fit 1” copper pipe connections from the heat exchanger coil output to the input of the boiler. The pipe run should include a circulator pump, a purge valve, shut off ball valve and a second purge valve in that order.
    10. Solder the connections with solder and a propane torch.
    11. Break the connection to the main water supply into the boiler using a pipe cutter. Be sure to have a bucket ready to catch any excess water.
    12. Dry fit ½” copper pipe connections from the main water supply to the cold water input at the bottom of the indirect water heater. Use appropriate adapter pipe fittings, pipe dope and plumber’s tape to connect piping. The pipe run should include a tee coupling to reconnect the new run to the boiler. Include a shut off valve after the coupling into the boiler. Extend piping off the middle portion of the tee coupling. Pipe should extend to the indirect water heater and include a draw off valve at the cold input. Additional pipe should also be connected to the thermostatic mixing valve.
    13. Break the connection from the boiler to the main hot water feed into the home using a pipe cutter.
    14. Dry fit the ½” copper pipe connections from the output on top of the indirect water heater. The pipe run should feed to a relief valve, the thermostatic mixing valve and connect to the main hot water feed into the home.
    15. Solder the connections with solder and a propane torch.
    16. Attach a temperature sensor to the indirect water heater.
    17. Attach an electronic relay to the boiler.
    18. Make the electrical connections from the temperature sensor to the relay on the boiler and the circulator pump.
    19. Turn the main power switch on the boiler back on.
    20. Turn the water supply valve back on.
    21. Use the purge valves to eliminate any excess air in the system. You’ll need a bucket to catch the water.
    22. It will take some time for the water heater tank to fill and heat up.

    Follow This Old House and Ask This Old House:
    Facebook: https://www.facebook.com/ThisOldHouse
    Twitter: https://twitter.com/thisoldhouse

    https://twitter.com/asktoh

    Pinterest: https://www.pinterest.com/thisoldhouse/
    G+: https://plus.google.com/+thisoldhouse/posts
    Instagram: https://instagram.com/thisoldhouse
    Tumblr: https://thisoldhouse.tumblr.com/

    This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Lilith from Porto - 2017.12.19 11:10
    Problems can be quickly and effectively resolved, it is worth to be trust and working together.
    5 Stars By Camille from Nigeria - 2017.10.23 10:29

    Related Products

    WhatsApp Online Chat !