China Professional Supplier 22611-T Swaged Hose Fiting to Lahore Factories

Short Description:

BSP FEMALE 60° CONE    PART NUMBER HOSE THREAD    T B mm L mm A mm   H2 mm   DN In SIZE             S226A1 – 03 – 02 5 3/16″ 03 1/8″ – 28 3 14,6 4,4   14 S226A1 – 03 – 04 5 3/16″ 03 1/4″ – 19 4 18 5,2   19 S226A2 – 04 – 02 6 1/4″ 04 1/8″ – 28 3 15,5 4,4   14 S226A1 – 04 – 04 6 1/4″ 04 1/4″ – 19 4 18 5,2   19 S226A1 ...


Product Detail

Product Tags

Related Video

Feedback (2)

Our primary goal is always to offer you our customers a serious and responsible company relationship, providing personalized attention to all of them for Pvc Fittings , BSPT Pipe Fittings , Metric Pipe Fittings , We're not contented with the present achievements but we have been trying ideal to innovate to meet buyer's much more personalized needs. No matter where you will be from, we're here to wait for your type ask for, and welcom to go to our manufacturing unit. Choose us, you can fulfill your dependable supplier.
China Professional Supplier 22611-T Swaged Hose Fiting to Lahore Factories Detail:

BSP FEMALE 60° CONE 

14

 

PART NUMBER

HOSE

THREAD

   T

B

mm

L

mm

A

mm

 

H2

mm

 

DN

In

SIZE

 

 

 

 

 

 

S226A1 – 03 – 02 5 3/16″ 03 1/8″ – 28 3 14,6 4,4   14
S226A1 – 03 – 04 5 3/16″ 03 1/4″ – 19 4 18 5,2   19
S226A2 – 04 – 02 6 1/4″ 04 1/8″ – 28 3 15,5 4,4   14
S226A1 – 04 – 04 6 1/4″ 04 1/4″ – 19 4 18 5,2   19
S226A1 – 04 – 06 6 1/4″ 04 3/8″ – 19 7 19,1 6   22
S226A2 – 05 – 04 8 5/16″ 05 1/4″ – 19 4 18 5,2   19
S226A1 – 05 – 06 8 5/16″ 05 3/8″ – 19 7 19,1 6   22
S226A2 – 06 – 04 10 3/8″ 06 1/4″ – 19 4 18 5,2   19
S226A1 – 06 – 06 10 3/8″ 06 3/8″ – 19 7 19,6 6   22
S226A1 – 06 – 08 10 3/8″ 06 1/2″ – 14 9,5 20,5 6,5   27
S226A2 – 08 – 06 12 1/2″ 08 3/8″ – 19 7 20,8 6   22
S226A1 – 08 – 08 12 1/2″ 08 1/2″ – 14 9,3 20,8 6,5   27
S226A1- 08 – 10 12 1/2″ 08 5/8″ – 14 12 20,8 9,7   30
S226A1-08-12 12 1/2″ 08 3/4″ – 14 15 23,3 9   32
S226A2-10-10 16 5/8″ 10 5/8″ – 14 12 20,3 9,7   30
S226A1-10-12 16 5/8″ 10 3/4″ – 14 15 23,3 9   32
S226A2-12-12 20 3/4″ 12 3/4″ – 14 15 24,5 9   32
S226A1-12-16 20 3/4″ 12 1″ – 11 19,5 26 10,5   38
S226A2-16-16 25 1″ 16 1″ – 11 19,5 27,3 10,5   38

Product detail pictures:

China Professional Supplier
 22611-T Swaged Hose Fiting to Lahore Factories detail pictures


Related Product Guide:
Importance of PVC Fittings
How to Replace a Hydraulic Hose Fitting

We love an incredibly fantastic standing amid our consumers for our superb item high quality, aggressive rate and also the finest assistance for China Professional Supplier 22611-T Swaged Hose Fiting to Lahore Factories, The product will supply to all over the world, such as: Brazil , Georgia , Turkey , We believe with our consistently excellent service you can get the best performance and cost least goods from us for a long term . We commit to provide better services and create more value to all our customers. Hope we can create a better future together.


  • World’s first leak-tight double block and bleed isolation of a high pressure CO2 pipeline system.

    STATS Group were contracted by Kinder Morgan to provide a pipeline hot tapping and plugging operation on a high pressure 30” Carbon Dioxide pipeline operating at 2,140 psi.

    The purpose of this project, which took place as part of a larger initiative to convert a non-piggable pipeline into a piggable pipeline, was to install full bore inline valves and retrofit pigging launchers and receivers into the pipeline system. The installation of a 24” bypass pipeline around the isolated section allowed continuous production and avoided system downtime during maintenance activities.

    This intervention operation took place on a 500 mile 30” CO2 pipeline that operates from source fields in southwestern Colorado to Denver City, delivering product primarily used for enhanced oil recovery. The pipeline is currently undergoing significant upgrades to facilitate a transition to a piggable pipeline for ease of ongoing inspection and maintenance.

    Pipeline isolation was provided with the installation of STATS patented BISEP™. The BISEP™ provides fail-safe double block and bleed isolation deployed through a single full bore hot tap penetration. The leak-tight isolation provided, dramatically increases safety over traditional line-stop technology and doesn’t require any additional hot tap vents or bleed ports. The BISEP™ contains dual energised seals and the annulus zero-energy zone proves and monitors the seal integrity before and during intervention work.

    STATS have carried out isolations at five sites along the CO2 pipeline operating at around 2,000 psi and have completed in excess of 190 days of individual BISEP™ isolation, whilst avoiding system downtime during critical maintenance activities.

    For more information visit – http://www.statsgroup.com/

    We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
    5 Stars By Grace from Mauritius - 2016.08.18 18:38
    It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
    5 Stars By Belle from Singapore - 2016.08.28 16:02

    Related Products

    WhatsApp Online Chat !